Photovoltaics > Langzeitmonitoring > Plant overview > Newtech |
PV-plant NewtechComparison of the operation and energy yield of 3 grid connected 1kWp-photovoltaic plants (Newtech 1-3) with different thin film solar cells-technologies (a-Si-triple-cells, a-Si-tandem-cells and CuInSe2-cells). The 3 PV plants are at the same location and each of them is operated with an own, identical inverter (ASP Top Class Spark). BFH-TI Burgdorf has installed an analytical monitoring system for detailed analysis of the 3 PV plants. Initial degradation of the modules will be measured. Therefore the monitoring system and the PV plants started operating at the same time. Operation of the PV plant and the monitoring system started on 17.12.2001. ![]()
|
|||||||||||||||||||||||||||||||||||||||
| Location: | Burgdorf; 540 m |
| Orientation: | 0° south, 30° tilted |
| Start up: | 17.12.2001 |
| Measured parameters: |
|
Newtech 1: | |
| Module: | Siemens ST 40 (CuInSe2-cells) (24 pieces) |
| PV generator power: | 960 Wp (nominal) |
Gross area: | 10.21 m2 |
| Inverter: | ASP Top Class Spark |
Newtech 2: | |
| Module: | Solarex Millennia MST 43-LV (a-Si-Tandem cells) (20 pieces) |
| PV generator power: | 860 Wp (nominal) |
Gross area: | 16.37 m2 |
| Inverter: | ASP Top Class Spark |
Newtech 3: | |
| Module: | Uni-Solar US-64 (a-Si-Tripel cells) (16 pieces) |
| PV generator power: | 1024 Wp (nominal) |
Gross area: | 16.20 m2 |
Inverter: | ASP Top Class Spark |
Table of the normalized presentation
Detailed publication about the normalized presentation
Block diagram from a PV-plant with detailed monitoring
© 2003-2009 Bern University of Applied Sciences Engineering and Information Technology - Last Updated: 01/17/2013